SSNNLL Narmada Canal – Baroda, GJ

2.5
Poly-crystalline
Central
2018
The SSNNL Narmada Canal project is situated in Baroda, Gujarat, with a capacity of 2.5 MW. It utilizes poly crystalline solar modules and Schneider inverters. The project was commissioned in 2018 and features single-axis tracker technology. It showcases Gujarat's innovative approach to solar power generation by utilizing canal-based installations.