...

Green Hydrogen Production Cost in India: Fuel of the Future

By Dr Hemanshu Bhatt on 1 January 2025

Green Hydrogen Production Cost in India: Fuel of the Future

Green Hydrogen Production Cost in India: Green hydrogen’s potential to decarbonise hard-to-abate sectors such as steel, cement, fertilisers and heavy-duty transportation has positioned it as a cornerstone of the global energy transition.

India, with its abundant renewable energy resources and ambitious carbon neutrality target by 2070, has placed green hydrogen at the forefront of its energy strategy being implemented through the National Green Hydrogen Mission. The country’s renewable energy landscape plays a crucial role in this initiative. As of 2024, India has 128 GW of installed solar and wind capacity, with a target of reaching 500 GW by 2030.

The cost of renewable power in India is among the lowest in the world, and coupled with extensive renewable energy infrastructure, this positions India as a promising global hub for affordable green hydrogen production. However, the economic viability of green hydrogen remains a pressing challenge. At production costs of Rs 350-Rs 450 per kg, green hydrogen struggles to compete with grey hydrogen (Rs 160-Rs 200 per kg) derived from natural gas, which is used throughout the industry.

Explore InSolare’s projects to see our expertise in delivering reliable renewable energy infrastructure across India. InSolare is advancing India’s green hydrogen ecosystem through integrated solutions across electrolyser manufacturing, green hydrogen, and green ammonia. With expertise spanning project development and EPC, InSolare is building scalable solutions to accelerate India’s transition to clean energy. Explore InSolare’s green hydrogen capabilities and discover our journey across electrolyser manufacturing, green hydrogen, green ammonia, and hydrogen EPC projects.

Recent Newsroom

InSolaRE Energy Limited | 18th Annual General Meeting 2026 InSolaRE Energy Limited | 18th Annual General Meeting 2026

The recording of InSolaRE Energy Limited’s 18th Annual General Meeting...

InSolare is rebranding: Unveils New Brand Identity InSolare is rebranding: Unveils New Brand Identity

  InSolare is Rebranding: Unveils New Brand Identity  The new identity...

45 MWp Solar Project in Karnataka: Bengaluru Developer Unlocks ₹1,075 Crores 45 MWp Solar Project in Karnataka: Bengaluru Developer Unlocks ₹1,075 Crores

Rising commercial grid tariffs and unhedged operational costs pose a...

Scroll to Top
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.