C&I RE Project Case Study (Cement sector)

By Insolare on 1 September 2023

C&I RE Project Case Study (Cement sector)

With the growth of Renewable Energy (RE) in the past decade, several C&I entities have endeavoured to shift their electricity consumption from brown conventional power to green RE based power. This shift facilitates significant savings on electricity costs as well as drive down net carbon emissions, in line with several of the large-scale C&I entities sustainability targets. Hence, through this case study, we have analysed the RE adoption efforts of MP Birla Cement viz. one of the largest cement manufacturers in India.

As of March 2023, MP Birla Cement have installed a RE capacity of around 86 MW. RE solutions employed by MP Birla Cement include off-site/on-site Solar (41.2 MW), Waste Heat Recovery Systems (WHRS, 44.85 MW).

Recent Newsroom

The Economic Times Digital The Economic Times Digital

As InSolare Energy celebrates Founders’ Day, it’s not just a...

The role of battery energy storage systems in sustainable data centers The role of battery energy storage systems in sustainable data centers

While many data centres have started using solar power as...

Driving sustainable development with data and AI in renewable energy: An interview with Dr Sunit Tyagi Driving sustainable development with data and AI in renewable energy: An interview with Dr Sunit Tyagi

From predictive maintenance and power forecasting to the evolving role...

Scroll to Top